Banhez coffee shop, interior view of the bar and seating

  • Coffee Shop
  • Retail Design
  • Madrid, Spain

Designed by

Valeria Vela

2025

3

Banhez, bakery counter and seating overview

A design proposal for a gluten-free café in the Argüelles neighborhood.

Inspired by Mexican culture and its artisanal traditions. The project translates the color and visual energy of alebrijes into a contemporary spatial language, balanced by a palette of warm, sustainably sourced materials.

The coffee shop unfolds across three zones: a bakery counter conceived as a display piece, an open barista station, and a relaxed seating area overlooking the street.

Alebrije rabbit, full figure
Alebrije pattern detail

Inspired by Mexican alebrijes — fantastical creatures born from dreams and folk tradition, believed to guide and protect the spirit. Their intricate Zapotec patterns carry stories of identity, nature, and the unseen world, translated here into form and detail.

“Banhez”

Is a Zapotec word that conveys a wish for well-being, happiness, and good fortune.

Banhez floor plans at scale 1:70 with the material palette: oak, green herringbone tile, terracotta and linen
Wood-clad seating nook, wide shot
Street-facing bar with stools
Dark accent nook with sculptural lighting
Terracotta dining nook

Next project

02/

All projects
Banhez-coffee shop
4